Client
John Sisk & Son
Building Use
Site accommodation
Project Duration
2 months
Procurement Method
Hire
Why Hire from Portakabin?Project Features
- 27 x Konstructa modules
- New triple stack formation
- Riverside location
- 450m2 construction office space
-
Requirements
With around 200 workers on site at any given time during construction, main contractor John Sisk & Son wanted to offer all workers the best possible welfare facilities during the development, a multimillion Euro project which will see Ireland’s tallest building constructed.
-
Solution
Portakabin installed 27 modules in an innovative new triple stack formation for John Sisk & Son, providing 450m2 of office space. Craning in beside the bustling River Liffey and alongside one of the city’s major arterial roads, Portakabin displayed its long running logistical expertise with minimal impact on the live site and surrounding environment.
Tony Dunne, Hire Manager at Portakabin said: “We custom-designed a triple-stack structure of our site accommodation product, which we have never done before; putting modules together like this meant that space was optimised on the busy construction site.
"Despite designing and testing something completely new to us, we were able to deliver and install the buildings just two months after initial talks with John Sisk & Son.”
Portakabin understood the importance of health and safety as well as the quality and aesthetic of products on the docklands site. The team were efficient, helpful and delivered a quality product on time.
A unique promise for your complete peace of mind
Knowing you will meet your targets is a great starting point for any building project
Walls Construction
In under three months from initial order, Portakabin delivered a large-scale modular complex and site cabins to support 84 office staff and numerous general operatives at Walls Construction
Suir Engineering
Double-stacked office space and meeting facility delivered for Suir Engineering in just one month.
Huntstown Power Station 2022
Temporary contractors village delivered for Huntstown Power Station, including a large modular canteen and office facilities for up to 300 staff.