Client

Portakabin

Building Use

Offices

Project Duration

8 weeks

Procurement Method

Buy

Why buy from Portakabin

Project Features

  • Fully DDA compliant
  • Platform lift
  • Innovative heating and ventilation
  1. The Requirements

    Frederick House is the new home of the Portakabin International Head Office. This two-storey scheme sits in the heart of the Portakabin production facility in York.

    The new facility houses office suites, state-of-the-art boardroom and meeting facilities, a main reception area and high-end amenities.

  2. The Solution

    Aluminium cladding was paired with contrasting real timber to provide a contemporary aesthetic to the main façade. The boardroom sits directly above the main reception area and benefits from the use of switchable privacy glass, which uses electro-chromatic technology to interchange between transparent and opaque at the press of a button.

    This scheme was fully designed in-house by the Portakabin Design and Engineering department.

    Concept design through to completion took only eight months, including the demolition of the existing headquarters.

The new facility boasts 36m² roof mounted photovoltaic panels, air source heat pumps, mechanical ventilation with heat recovery and daylight linked LED lighting, to provide an EPC A rated building.

Derek Carter, Chief Executive, Portakabin

A unique promise for your complete peace of mind

Knowing you will meet your targets is a great starting point for any building project