Client

Manchester Airport

Building Use

Offices

Project Duration

10 weeks

Procurement Method

Hire

Why hire from Portakabin

Project Features

  • Office space, specialist workshops and storage
  • Specialist external tyre cages and a VRV Heat Cool system supplied by Portakabin
  • Reinforced floor in storage area to support heavy tyres
  1. The Requirements

    While Terminal Two at Manchester Airport undergoes a £1bn transformation, airside office space and high-quality engineering workshops were required to accommodate specialist engineers from Storm Aviation.

    The space needed to be capable of providing a modern office environment as well as a specialist engineering workshop. Airside storage of aircraft tyres was essential along with a specialist heating and cooling system inside to maintain a constant air temperature, free from air currents and dirt.

  2. The Solution

    Joelle Ivett, Project Manager for MAN-TP, Arcadis said: “The Portakabin team had a fantastic attitude towards safety in this challenging location. Our site was well organised and the on-time delivery of the building enabled us to move tenants in and continue with the transformation programme almost immediately.”

Along with our teams working so well together, Portakabin has been absolutely key to this project. Their professional approach in wanting to get this job completed and to the highest standards has been refreshing to say the least.

Steve Harmer, Operations Manager, Galliford Try Infrastructure – Aviation Management and Construction

A unique promise for your complete peace of mind

Knowing you will meet your targets is a great starting point for any building project

Find out more Contact us
Case Studies
Fully inclusive and free
GET A QUOTE
Get your free brochures
DOWNLOAD
Book an appointment
BOOK
Back to Top