Client
Manchester Airport
Building Use
Offices
Project Duration
10 weeks
Procurement Method
Hire
Why hire from PortakabinProject Features
- Office space, specialist workshops and storage
- Specialist external tyre cages and a VRV Heat Cool system supplied by Portakabin
- Reinforced floor in storage area to support heavy tyres
-
The Requirements
While Terminal Two at Manchester Airport undergoes a £1bn transformation, airside office space and high-quality engineering workshops were required to accommodate specialist engineers from Storm Aviation.
The space needed to be capable of providing a modern office environment as well as a specialist engineering workshop. Airside storage of aircraft tyres was essential along with a specialist heating and cooling system inside to maintain a constant air temperature, free from air currents and dirt.
-
The Solution
Joelle Ivett, Project Manager for MAN-TP, Arcadis said: “The Portakabin team had a fantastic attitude towards safety in this challenging location. Our site was well organised and the on-time delivery of the building enabled us to move tenants in and continue with the transformation programme almost immediately.”
Along with our teams working so well together, Portakabin has been absolutely key to this project. Their professional approach in wanting to get this job completed and to the highest standards has been refreshing to say the least.
A unique promise for your complete peace of mind
Knowing you will meet your targets is a great starting point for any building project