Client
CPL Products
Building Use
Office space including a kitchen, welfare facilities and meeting room
Project Duration
3 months
Procurement Method
Hire
Why Hire from Portakabin?Project Features
- Accessible steps
- Air conditioning
- Emergency lighting
- Groundworks package
- Data
- Fire alarm
-
Requirements
CPL Products were in desperate need of additional office space to cater for their growing team in Immingham, and in addition needed a meeting room, kitchen and welfare facilities. With a specific budget in mind, Portakabin was challenged with creating a cost-effective solution that had to fit in their existing estate footprint, without compromising on quality or design.
-
Solution
To ensure the client had clear access to an adjacent building, the modules were designed to fit into the dedicated 10m wide area. In order to keep within the client’s budget, Portakabin was able to provide a building which had already been fitted out internally, offering CPL Products the best value for a premium product.
In addition, Portakabin installed double storey foundation pads to the buildings, allowing CPL Products the option to extend their current office space in the future with an additional first floor building if they required.
The team at Portakabin were amazing from concept design right through to handover. Ensuring our needs were met at ever stage of the process, the Portakabin team delivered a new office space which was perfect for us, and we couldn’t be happier.
A unique promise for your complete peace of mind
Knowing you will meet your targets is a great starting point for any building project
Pharmaceutical Laboratory
An urgent extension high spec medical microbiological diagnosis